Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

En
4

opERation

• Remove battery cover and put in 4 x AA batteries (take care to polarity).
• Set up tripod-/wall mount to bilders' tripod or to a wall. Center two bub-
bles no. 4 by means of footscrews no. 6.
• Switch on the unit. With the on/off-switch you can also increase rotating
speed. At the same time a plumb beam is emitted to the ceiling.
VERTiCAL USE
• Set up the tripod-/wall mount to builders' tripod. Center bubble no. 5 by
means of footscrew no. 6. All functions as above.
APPLiCATiON
• Horizontal and vertical alignments at indoor works
• Transferring levels, aligning stud walls, doors, windows
• Levelling of tiles, levelling of drill holes.
10
www.geo-fennel-ecoline.com

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis