Herunterladen Diese Seite drucken

Vertiv LIEBERT GXT5 Schnellinstallationsanleitung Seite 2

230 -v 8,000 – 10,000 va

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5
LIEBERT® GXT5™ UPS 230 -V 8,000 – 10,000 VA
Quick Installation Guide
GXT5
UPS to External Battery Cabinet Connections
TM
GXT5-8000/10KHVRT5UXLN
Single/First EBC
Second EBC
exposed to direct sunlight.
For proper ventilation, leave
four inches clearance on all
sides of the UPS.
The input outlet should be
nearby and easily accessible.
3. Installing the UPS
The UPS and optional External
Battery Cabinets may be
installed in either a tower or
rack confi guration. For tower
installation, assemble and
attach the tower support
stands. For rack installation,
attach the brackets to the UPS,
install the rail kit in the rack if
needed, and install the UPS in
the rack.
NOTE: This UPS is not for use in a
computer room as defi ned in the
standard for the protection of
electronic computer/data
processing equipment of ANSI/
NFPA 75.
2
590-1968-664A/SL-70328_REV0
EBC terminal
Shown
Recommended (Maximum) external overcurrent
protection
Recommended wire (all wires) 75°C copper wire
Maximum wire accepted by terminal block
Terminal-block torque
CONNECTIONS
4. Connecting External
Battery Cabinet
(Optional)
External battery cabinets (EBC)
provide longer battery run-time
for connected devices. Refer to
GXT5 User Guide, to select the
appropriate model and quantity
for your GXT5 model and
applications.
• Verify that the EBC breaker
60 A
7 AWG (10 mm
6 AWG (16 mm
20 in-lb (2.26 Nm)
is in the "Off " position.
• Connect one end of the
supplied EBC cable to the
UPS and one end to the
battery cabinet. If connecting
more than one external
battery, connect one end of
the external battery cable to
the second connector on the
battery cabinet, then connect
the other end to the next
battery cabinet.
5. Connecting AC Input
Refer to the wiring table above
for the recommended
)
2
)
2

Werbung

loading