Herunterladen Diese Seite drucken

Rehau RAUSIKKO Box Einbau Und Wartung Seite 25

Vorschau ausblenden Andere Handbücher für RAUSIKKO Box:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
EN
When building percolation systems with RAUSIKKO Boxes no gravel is
required to fill the gravel trench as with conventional pipe trenches.
When assembling multi-layer Box systems the Boxes are fixed on top of each
other using integrated push-fit socket connections.
Push-fit socket connection on the top and bottom of the Box
When fixing together multi-layer Box systems, connecting clips may also be
used.
Connecting clip
25

Werbung

loading