Herunterladen Diese Seite drucken

MCS Master CF 75A Benutzer- Und Wartungshandbuch Seite 18

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
►►5.POSITIONING (Fig. 1)
en
READ THE WARNINGS CAREFULLY
it
AND FOLLOW THE RECOMMENDA-
TIONS CONTAINED IN THIS INSTRUC-
de
TION MANUAL BEFORE AND DURING
es
INSTALLATION.
fr
THE HEATER MUST BE POSITIONED
nl
BY QUALIFIED PERSONNEL BY US-
pt
ING SUITABLE DEVICES AND INSTRU-
MENTS, IN ACCORDANCE WITH NA-
da
TIONAL REGULATIONS AND CUR-
fi
RENT STANDARDS.
no
••IMPORTANT: Do not power on the
sv
heater before the installation has been
pl
completed in order to prevent damage to
property and/or injury to persons.
ru
cs
This heater is designed to be installed
indoors or outside a building. It can be
hu
installed outdoors only with the desig-
sl
nated original kit (Paragraph on "Option-
tr
al items"). Before positioning the heater,
make sure you have identified the correct
hr
position for the installation, away from
lt
flammable materials, with the right dis-
tance from the ground so as to not ob-
lv
struct, not even in part, the air intake grid
et
at the bottom of the heater. This is why
ro
you need to check the grid is at the right
distance from the ground or materials
sk
that can be drawn in. The place where
bg
it is installed must be easy to access to
make normal maintenance and inspec-
uk
tion operations easier. The heater must
bs
be secured safely and permanently to the
structure. Do not attach additional weight
el
to the heater.
zh
►5.1.INDOOR INSTALLATION ON THE
CEILING (Fig. 2-3)
Each chain and suspension hook must
withstand a minimum weight of 100 kg.
The surface on which the product is at-
tached (for instance the ceiling) must
withstand a minimum weight of 200 kg.
There must be a positive angle between
the chains and a value that can ensure
stability, in order to prevent dangerous os-
cillations.
►5.2.INSTALLATION ON THE WALL
(Fig. 4)
Each wall plug must withstand a minimum
load of 200 kg. The masonry structure
must withstand the weight of the heater
placed on the brackets.
►5.3.OUTDOOR INSTALLATION ON
THE WALL (Fig. 5)
Each wall plug must withstand a minimum
load of 200 kg. The masonry structure
must withstand the weight of the heater
placed on the brackets. The air intake and
booster ducts must follow the specifica-
tions described in the original kit (Para-
graph on "Optional items").
►►6.CONNECTION TO THE GAS
MAINS (Fig. 6)
READ THE WARNINGS CAREFULLY
AND FOLLOW THE RECOMMENDA-
TIONS CONTAINED IN THIS INSTRUC-
TION MANUAL BEFORE AND DURING
INSTALLATION.
THE GAS SUPPLY LINE AND CON-
NECTION MUST BE CARRIED OUT
BY AN QUALIFIED TECHNICIAN BY
USING SUITABLE DEVICES AND IN-
STRUMENTS, IN ACCORDANCE WITH
NATIONAL REGULATIONS AND CUR-
RENT STANDARDS.
The heater is designed to operate with dif-
ferent kinds of gas, but it is supplied with
specific factory settings (see data plate
applied on the heater). Never exceed the
maximum supply pressure values report-

Werbung

loading

Diese Anleitung auch für:

Cf 75