Herunterladen Diese Seite drucken

Le Chai LM78 Bedienungsanleitung Seite 136

Errichtet weinkeller
Vorschau ausblenden Andere Handbücher für LM78:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

GLASS OVERLAY DOOR GUIDE
LBN458POP
1. Door Panel Preparation
Depending on the wine cellar model prepare the overlay panel to the dimensions shown below. Then
attach the handle to the overlay panel by using the flat head screws and drive the screws flush with the
panel if needed.
NOTE:
1. H = Height of door + 2mm, W = Width of door + 4mm.
2. Weight of the overlay panel should not exceed 10 kilograms.
3. It is important to ensure that all drilled holes are drilled to the correct depth in order to avoid
splits in the wood when hardware is installed.
4. Drill the handle installation holes in the overlay panel according to the handle you are
planning to use.
2. Door Panel Installation
Remove the door gasket (4) completely from glass door (2). Start in a corner and pull outward. This
may take some force. Set gasket down on a flat surface for later installation.
Attach the wood overlay panel (1) on the glass door (2) by using the eight wood screws ST4x30
Type AB Philips (3).
Install the wood overlay glass door on the unit as normal.
EN-136

Werbung

loading