- Connect the conductors to the terminals PE, N, L (fig. 8) in accord-
ance with the terminal marking (fig. 9)
- Connect protective earth to the enclosure (fig 6, 7)
- Insert the reflector into the 4 fixing screws (fig. 5)
- While closing the reflector protect wires from squeezing in.
- Also tighten the 4 screws (1.5 Nm).
- Now tighten the cable entry (see technical datas).
- Insert the cover plane into the hinges.
- Close the cover plane using the locking screws (fig.1).
Attention
In case of unused cable entries, remove their protective cover and
close the entries with a blanking plug (torque see technical datas).
When closing the gland with a blanking plug, always use sealing inserts
1+2!
When metal cable entries are used, the protective caps of the unused
entries are to be removed and the entries to be closed with certified Ex
blanking plugs! (min. IP 65) Fitting the lamps
6.
Taking into operation
Prior to operation, check the light fitting for its proper functioning and
installation in compliance with these operating instructions and other
applicable regulations!
Only carry out insulation measurements between PE and the external
conductor L1 (L, L2, L3) as well as between PE and N.
– measuring voltage: max. 1 kV AC/DC
– measuring current: max. 10 mA
Explosion Protected Recessed Ceiling light fittings RLF LED 600/1200
7 .
Maintenance / Servicing
Observe the national regulations applicable to the maintenance,
servicing and test of apparatus for explosive atmospheres e.g
IEC/EN 60079-17 and IEC/EN 60079-19 as well as the general rules of
engineering!
Repairs that affect the explosion protection (see national standard),
may only be carried out by CCH/CEAG or a qualified "electrician"!
When servicing, in particular those components that affect the explosion
protection, will have to be checked, e. g.:
- Housing and cover pane for any cracks or damages.
- Gaskets for their perfect condition.
- Terminals and blanking plugs for their firm fit.
8.
Repair
Prior to replacing or removing any components, observe the
following:
Cut the apparatus off the voltage before opening it or carrying out repairs!
Only use certified genuine CCH/CEAG spare parts!
Subject to alteration or supplement of this product series.
Regarding waste disposal, observe the relevant national regulations! The
plastic materials are marked with material identifications.
EN
9