Herunterladen Diese Seite drucken

STIEBEL ELTRON MEKD Bedienung Und Installation Seite 22

Druckfeste armatur für durchlauferhitzer
Vorschau ausblenden Andere Handbücher für MEKD:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION
Installation
6.3
Connecting the hot water boiler
3
2
1 Cold water connection
2 Connection to tap body
3 DHW connection
f If necessary shorten the connection pipes to the required
length and deburr the cut edges.
f Slacken off the union nuts of the threaded fittings at the con-
nections on the tap body.
f Insert the connection pipes vertically through the union nuts
into the connections on the tap body.
f Screw the connection pipes loosely to the tap body using the
union nuts.
f Fit the hot water boiler.
f Hand-tighten the connection pipes to the connections of the
hot water boiler using the O-rings and the union nuts.
22
| MEKD | MEBD
f With a spanner, apply a small amount of torque to tighten
the union nuts of the threaded fittings to the tap body.
MEKD only
f Screw the spout with O-ring onto the tap body until
1
finger-tight.
2
On a bath – MEBD only
f Screw the spout with O-ring onto the tap body until
finger-tight.
f Screw the retainer for the hand shower with O-ring onto the
spout until finger-tight.
f Screw the hose with O-ring onto the retainer for the hand
shower until finger-tight.
f Screw the hand shower with O-ring onto the hose until
finger-tight.
On a shower – MEBD only
f Screw the retainer for the hand shower with O-ring onto the
tap body until finger-tight.
f Screw the hose with O-ring onto the retainer for the hand
shower until finger-tight.
f Screw the hand shower with O-ring onto the hose until
finger-tight.
www.stiebel-eltron.com

Werbung

loading

Diese Anleitung auch für:

Mebd205624205623