Herunterladen Diese Seite drucken

GF CONTAIN-IT Plus Bedienungsanleitung Seite 16

Mechanische trennung
Vorschau ausblenden Andere Handbücher für CONTAIN-IT Plus:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3. Installation
Before putting it into operation, the following 4 steps are required to mount the CONTAIN-IT
Plus Mechanical Joint:
Step 1: Installation of the CONTAIN-IT Plus Mechanical Joint
First the inner pipe of the CONTAIN-IT Plus Mechanical Joint is joined with the inner pipe of
the double containment pipe system. It is important to abide by the waiting times after fusion
or cementing as indicated in the chapter on "Jointing Technology" in the Planning
Fundamentals. When joining of the inner pipe has been completed, the pressure testing must
be done. Please make the necessary preparations as described in Step 2 prior to pressure
testing. When these preparations have been made, pressure testing may begin according to
the instructions in Step 3.
14/19

Werbung

loading