Herunterladen Diese Seite drucken

Dhollandia DH-SM.20 Montageanleitung Seite 29

Werbung

EN
G
M
Centre the platform, and check that it is parallel with the
rear cross member of the loading floor.
Note : there will be a gap between the rear cross member
of the loading floor, and the platform in horizontal work
position. This will need to be covered by a bridge plate
during operation.
This fitting method (with gap between platform and load-
ing floor) can only be used if the platform can be stopped
at the loading floor by other means than the standard
stops which are fitted to the front side of the platform. See
also Chapter 6.8 regarding arm stops.
§4.3 - Using the quick-fit transport rack (option S410)
With the option S410, the HTL is delivered fully premount-
ed on a transport rack [See Fig. 4.7].
In this case, the preparation is restricted to determining
the start point L1 for the sliding tubes under the chassis
[See Fig. 4.8].
DHOLLANDIA
4.7
4.8
29

Werbung

loading

Diese Anleitung auch für:

Dh-smr.20Dh-ssu.30Dh-ssur.30