Herunterladen Diese Seite drucken

ABB 6110 U-101-500 Betriebsanleitung Seite 29

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GB
Installation - Instructions ref. to Fig. 3
A deep combined wall and joint box should be used to
install the device; this box is not be to used as a branch-
ing box.
The bus lines are connected via the bus terminal block
6183-500.
ATTENTION
If insulated cores of 24 V bus and 230 V load-current
lines, including the 0 – 10 V control lines, are crossed or
in close proximity to each other, a distance of > 4 mm
must be observed (see ZVEI/ZVEH Building Services
Management Systems Manual).

Werbung

loading

Diese Anleitung auch für:

Gjb 000 6151 a 0187