Herunterladen Diese Seite drucken

Atag CBR-AP Bedienungsanleitung Seite 18

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

7
Remove all connectors of the
boiler control PCB;
8
Assembling the boiler control
unit is done in reversed order.
Make sure that no wires
are between the 2 parts
of the casing.
9
Switch on mains power;
10 The screen shows the start-
up procedure:
- Device discovery
- Initialising;
11 Option Language is shown.
Press the OK button.
-
-
Select the desired langage by
turning the select button.
Press the OK button.
-
The language is now selected.
7
8
12
12

Werbung

loading