Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Diagram - Lister SB 112 Gebrauchsanweisung

Heizbares tränkebecken mit schwimmerventil
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

SB 112 RBH
• at drinking bowl variant SB 112 H ZPS the valve will be connected by the attached 1/2" T-piece directly to
a ZPS-powered circulation pipeline and will be kept frost-free by the heat radiation of the circulation
water
• To ensure optimal frost protection a thermal insulation is needed at the circulation pipeline and at the
assembled 1/2" T-piece, too.
14
• At this variant the heating cable assembled at the bowl heats below the drinking bowl only and has no
additional pipe trace heating area.

Installation diagram

SB 112 ZPS

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sb 112 hSb 112 zps

Inhaltsverzeichnis