Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - EINHELL TE-CD 12/1 X-Li Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für TE-CD 12/1 X-Li:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
3. Always check for concealed electric cables
and gas and water pipes when drilling and
screwdriving in walls.

6. Operation

6.1 Charging the Li battery pack (Fig. 2-3)
1. Remove the battery pack (5) from the handle,
pressing the pushlock button (8) downwards
to do so.
2. Check that your mains voltage is the same as
that marked on the rating plate of the battery
charger. Insert the power plug of the charger
(6) into the mains socket outlet. The green
LED will then begin to fl ash.
3. Push the battery pack onto the battery char-
ger.
In section 10 (Charger indicator) you will fi nd a
table with an explanation of the LED indicator on
the charger.
If the battery pack fails to charge, check for the
following:
voltage at the power socket
whether there is good contact at the charging
contacts of the charging unit
If the battery pack still fails to charge, send
the charger and charging adapter
and the battery pack
to our customer service center.
To ensure that the Li battery pack provides
long service you should take care to recharge
it promptly. You must recharge the battery pack
when you notice that the power of the cordless
equipment drops.
Anl_TE_CD_12_1_X_Li_SPK9.indb 20
Anl_TE_CD_12_1_X_Li_SPK9.indb 20
GB
6.2 Torque setting (Fig. 4/Item 1)
Caution! Only ever adjust the setting ring when
the equipment is at a standstill.
The cordless screwdriver is fi tted with a mechani-
cal torque selector.
The torque for a particular screw size is set with
the setting ring (1). The torque is dependent on a
number of factors:
On the type and hardness of the material
involved
On the type and length of the screws used
On the requirements that the screw connec-
tion has to satisfy
The grating disengagement of the coupling in-
dicates that the selected torque level has been
reached.
6.3 Drilling (Fig. 4/Item 1)
For drilling purposes, adjust the setting ring for
the torque to the last setting "Drill". In the drill
setting the slip coupling is non-functional. The
maximum torque is available for drilling.
6.4 Changeover switch (Fig. 5/Item 3)
The slide switch above the On/Off switch is for
setting the direction of rotation of the cordless
screwdriver and for preventing the cordless
screwdriver from being switched on inadvertently.
You can select between clockwise and counter-
clockwise rotation. To avoid causing damage to
the gearing, the direction of rotation must only be
changed when the equipment is at a standstill.
When the slide switch is in the middle position,
the On/Off switch is blocked.
6.5 On/Off switch (Fig. 5/Item 4)
Infi nitely variable speed control is possible with
the On/Off switch. The further you push the
switch, the higher the speed of the cordless
screwdriver.
6.6 Switching from speed 1 to speed 2 (Fig.
4/Item 7)
You can work with a higher or lower speed de-
pending on the position of the selector switch.
Change the gear only when the drill is at a stand-
still. If you fail to observe this point, the gearing
may be damaged.
6.7 Battery capacity indicator (Fig. 6 /Item 2)
Press the battery capacity indicator switch (a).
The battery capacity indicator (2) indicates the
charge state of the battery on 3 colored LEDs.
- 20 -
16.10.2019 15:06:22
16.10.2019 15:06:22

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

45.135.92

Inhaltsverzeichnis