Herunterladen Inhalt Inhalt Diese Seite drucken

VOLTCRAFT 2346499 Bedienungsanleitung Seite 26

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connection
• Plug the energy meter into a regular grounded mains socket
(wall socket) of the public supply grid.
• Plug the desired load into the receptacle (3) of the smart sock-
et. Always turn the energy meter off before connecting a load.
Operation
• Press the
connected load. The load indicator light (2) lights up.
• Press the button again to turn off the power supply to the con-
nected load. The load indicator light goes out.
• Note the colours of the indicator light and their relationship to
power consumption of the connected load:
Colour
Greenish
Yellow to Orange
Red
Additional functionality is available in connection with the
accompanying app. Make sure to read the app instruction
manual.
26
On/Off button (1)
to turn on the energy meter to the
Power consumption
Low
Medium
High

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sem6000

Inhaltsverzeichnis