Herunterladen Inhalt Inhalt Diese Seite drucken

Assemble The Guide Bar And The Chain; Install The Battery Packs; Remove The Battery Pack; Operation - GreenWorks GD24X2CS36 Bersetzung Der Originalanweisungen

Vorschau ausblenden Andere Handbücher für GD24X2CS36:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 13
Examine the amount of oil in the machine. If the oil level
is low, add the guide bar and chain oil as follows.
IMPORTANT
Use guide bar and chain oil that is only for chains and
chain oilers.
NOTE
The machine comes from the factory without guide bar
and chain oil.
1. Loosen and remove the cap from the oil tank.
2. Put the oil into the oil tank.
3. Monitor the oil indicator to make sure that no dirt
enters in the oil tank while you add the oil.
4. Put the oil cap on.
5. Tighten the oil cap.
6. Check the level of oil from time to time.
IMPORTANT
Do not use dirty, used or contaminated oil. Damage
can occur to the guide bar or saw chain.
3.3
ASSEMBLE THE GUIDE BAR AND
THE CHAIN
Figure 1-7.
1. Remove the chain cover nuts with the wrench.
2. Remove the chain cover.
3. Put the chain drive links into the bar groove.
4. Put the chain cutters in the direction of the chain

operation.

5. Put the chain in position and make sure that the
loop is behind the guide bar.
6. Hold the chain and bar.
7. Put the chain loop around the sprocket.
8. Make sure the chain tension pin hole on the guide
bar fits correctly with the bolt.
9. Install the chain cover.
10. Tighten the chain. Refer to Adjust the chain tension.
11. Tighten the nuts when the chain is well tensioned.
NOTE
If you start the chain saw with a new chain, have a
test for 2-3 minutes. A new chain gets longer after the
first use, examine the tension and tighten the chain if
necessary.
3.4

INSTALL THE BATTERY PACKS

Figure 2
English
If the battery pack or charger is damaged, replace
the battery pack or the charger.
Stop the machine and wait until the engine stops
before you install or remove the battery packs.
Use only 24V battery packs. Do not use dual-
voltage 24/48V battery packs.
Both battery packs should be installed in the
compartments in order to start the machine.
1. Align the lift ribs on the battery pack with the
grooves in the battery compartment.
2. Push the battery pack into the battery compartment
until the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
4. Do the same operation with the other battery pack.
Optimize the power and performance of your
new 2x24V machine by running with both battery
packs charged to 100%. If each battery has a
different charge state, the run-time of the machine
is subject to the lowest powered battery (For
example: one battery is charged 100%, and the
other is charged 50%, the unit will only run until
the 50% battery is depleted).
3.5

REMOVE THE BATTERY PACK

Figure 2
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
4
OPERATION
Remove the battery pack and keep hands clear of the
lock out button when you move the machine.
Examine the chain tension before each use.
4.1
EXAMINE THE CHAIN
LUBRICATION
Do not use the machine without sufficient chain
lubrication.
Before working, the machine must be running for at
least 2 minutes in no-load condition after adding the
lubricant each time.
5
WARNING
NOTE
NOTE
IMPORTANT
NOTE
NOTE
EN

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cse405

Inhaltsverzeichnis