How to Use
1. Introduction
Unit Outline for Duty Rotation
In Duty Rotation, air-conditioning is managed by a running unit and
backup unit which rotates between two units after rotation interval has
elapsed.
• Unit connected to CN-CNT(A) is referred as Main unit.
• Unit connected to CN-CNT(B) is referred as Sub unit.
2. Setting Up Duty Rotation
2.1 Before setting up duty rotation, ensure that:
• Both CNT cables are connected to the main indoor unit and sub
indoor unit.
• Setting in Operation Screen (Mode, Set Temperature, Fan
Speed, Flap Position) is set to desired setting before turning
ON duty rotation.
MODE
AUTO
• Both main and sub units are turned off.
4
Main Unit
CN-RMT
CN-CNT(A)
11:35,Mon
SET TEMP.
FAN SPEED
25
AUTO
.0
FLAP
°
C
AUTO
Sub Unit
CN-CNT(B)
Remote Controller