Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Unpacking - ecoQ CoolAir 16+ Benutzerhandbuch

Mobiles klimagerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.

Installation

4.1 UNPACKING

Unpack the carton and take the appliance and accessories out.
Check the device after unpacking for any damage or scratches on it.
Accessories:
1.
Exhaust hose
2.
Hose connector
3.
Window kit adapter
4.
Remote control
5.
Drain hose
6.
Hot Air Stop
4.2 CHOOSE YOUR LOCATION
If tipped more than 45°, allow the unit to set upright for at
least 24 hours before start up.
Place the unit on a firm, level surface in an area with at
least 50 cm of free space around it to allow for proper air
circulation.
Do not operate in close proximity to walls, curtains, or
other objects that may block air inlet and outlet. Keep the
air inlet and outlet free of obstacles.
Never install the unit where it could be subject to:
Heat sources such as radiators,
heat registers, stoves or other
products that produce heat.
Direct sunlight
Mechanical vibration or shock
WARNING
INSTALL THE UNIT ONLY IN ROOMS WHICH EXCEED 13 m².
DO NOT INSTALL THE UNIT IN A PLACE WHERE INFLAMMABLE GAS
MAY LEAK.
2
1
5
6
Excessive dust
Lack of ventilation, such as
cabinet or bookcase
Uneven surface
Cool
Cool
Dry
Dry
Fan
Fan
Timer
Timer
3
4
Owner's Manual ecoQ CoolAir 16+
Speed
Speed
Swing
Swing
Sleep
Sleep
C/ F
C/ F
|
89

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

A000040

Inhaltsverzeichnis