Herunterladen Inhalt Inhalt Diese Seite drucken

Dantherm Gulliver RG2 Bedienungsanleitung Seite 8

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Oilburner
Type Gulliver RG2
One-line system:
On the tank installa-
tion, where vacuum
can occur in the oil
tubes, you install a
flow-control between
the front filter and the
oil burner.
The pump suction should
not exceed a maximum of
0.4 bar (30 cm Hg). Bey-
ond this limit gas is rea-
lised from the oil.
Oil lines must be complet-
ely air tight.
It is necessary to install a filter on
the fuel supply line.
Start the burner and wait for the priming.
Should lock-out ocur prior to the arrival of the fuel,
await at least 20 seconds before repeating the
operation.
The burner is designed to allow entry of the oil supply pipes on either side. Depending on
the oil supply pipes position (to the right or to the left hand side of the burner).
Page 4 of 9
Assembling
Dimensioning of the oil pipes
Max lenght of suction line
Dimensioning
H
8/10 mm
0 m
35 m
0,5 m
30 m
1,0 m
25 m
1,5 m
20 m
2,0 m
15 m
3,0 m
8 m
3,5 m
6 m
K:\framen\instrukt\Dantherm\RG\Engelsk\RG2\RG2.fm-M2-021106-dm/lbk
10/12 mm
100 m
100 m
100 m
90 m
70 m
30 m
20 m
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

377 t1970928

Inhaltsverzeichnis