Oilbuner
Type Gulliver RG2
One-line system:
The pump is designed to allow working with
two pipes. In order to obtain one pipe working
it is necessary to unscrew the return plug (2),
remove the by-pass screw (3) and then screw
again the plug (2).
It is sufficient to loosen the suction gauge con-
nection (5) and wait until oil flows out.
It is neccesary to install a filter on the fuel sup-
ply line.
Attention: Do not start the burner before oil
flows out.
Max lenght of suction line
H
8/10 mm
0,5 m
10 m
1,0 m
20 m
1,5 m
40 m
2,0 m
60 m
K:\framen\instrukt\Dantherm\RG\Engelsk\RG2\RG2.fm-M1-021106-dm/lbk
Assembling
Dimensioning of oil pipes
Dimensioning
10/12 mm
20 m
40 m
80 m
100 m
1. Suction line
2. Return line
3. By-pass screw
4. Pressure adjuster
5. Suction gauge connection
6. Oil valve
7. Gauge connection
GB
page 3 of 9