Herunterladen Inhalt Inhalt Diese Seite drucken

Kortel Design KONCEPT Benutzerhandbuch Seite 47

Vorschau ausblenden Andere Handbücher für KONCEPT:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Preparing your harness
Installation of the reserve parachute
WARNING!
The installation of a reserve parachute is not an insignificant 
act. It must be carried out rigorously, by qualified personnel. It 
is imperative to check the initial installation by a portal 
extraction test to validate that no element would interfere 
during extraction. This test must be carried out by the pilot 
himself, installed in his harness as he would be in flight.
The maintenance and servicing of the reserve parachute must 
be carried out according to the recommendations of its 
manufacturer.
The KONCEPT is originally equipped with a frontal removable
reserve container allowing all types of reserve parachutes. The
risers are also integrated, and connect directly to the container
thanks to the "Konnect" system.
Nevertheless, it is possible to connect any type of frontal
container. We recommend the use of the "Kontainer-Kockpit",
which is particularly suitable for this type of harness.
Refer to the installation instructions for the selected belly
Refer to the installation instructions for the selected belly
container.
container.
1
2
It is recommended to redo a complete installation of the
It is recommended to redo a complete installation of the
reserve parachute in the container once a year (belly or
reserve parachute in the container once a year (belly or
integrated), and to check the good general condition of the
integrated), and to check the good general condition of the
assembly (needles, elastics, velcro, absence of humidity, ...).
assembly (needles, elastics, velcro, absence of humidity, ...).
The passage of the emergency risers must be outside the
The passage of the emergency risers must be outside the
accelerator passage. It is imperative to check this during
accelerator passage. It is imperative to check this during
installation.
installation.
47
Koncept
3
6
6
6
Zipped sheath
1
Riser connection buckles
2
Riser container connection
3
Frontal reserve container
4
reserve handle
5
Container connection clips
6
4
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis