5
Mounting
5.1
Preparing mounting
If you want to install several products, create an installation plan with the indi-
vidual installation sites. Label the individual products according to the instal-
lation plan with a number or the designation of the installation.
Verify that all connected devices can be used at the installation site.
Verify that the installation site is not in shielded areas or recesses.
Verify that the solar-operated energy storage module has been charged.
- Regular daylight is sufficient for charging the energy storage module.
- Exposure to direct sunlight reduces the charging time.
5.2
Connecting the product to AFRISOhome gateway
The procedure is described in the operating instructions of the AFRISOhome
gateway.
Verify that the EnOcean wireless signal of the product reaches the AFRI-
SOhome gateway or is in the vicinity of the AFRISOhome gateway.
Verify that the AFRISOhome gateway is in "Learn" mode.
ELECTROSTATIC DISCHARGE
•
Always earth yourself before touching electronic components.
•
If you press down the LRN pushbutton with a finger, make sure to avoid elec-
trostatic discharge.
Failure to follow these instructions can result in equipment damage.
Mounting
NOTICE
EN
10
FTM