Herunterladen Inhalt Inhalt Diese Seite drucken

Preparation For Operation - Steinberg Systems SBS-LVS-100 Bedienungsanleitung

Laborschüttler
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1 - Unit casing
2- Front control panel
3 - Surface of working base
4 - Anti-slip base
5 - Power on/off switch

3.2. Preparation for operation

POSITIONING OF THE UNIT
The ambient temperature must not exceed 40°C. Place the unit in a way that
ensures good air circulation. Maintain a minimum clearance of 10 cm from any wall
of the unit. Keep the unit away from any hot surfaces. Always operate the unit on a
level, stable, clean, fireproof and dry surface and out of the reach of children and
persons of impaired mental, sensory and intellectual functions. Place the unit in
such a way that the mains plug can be reached at any time. Ensure that the power
supply to the unit corresponds to that specified on the identification plate!
6 - Speed adjustment knob
7 - Work time adjustment knob
8 - Appliance power output
9 - Appliance fuse 2A
10 - Power cord

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis