Herunterladen Inhalt Inhalt Diese Seite drucken

Polar GE632 Bedienungsanleitung Seite 6

Bierzapfanlage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35
UK
8. In case the beer tower is not stable, you can adjust the tap as needed. Open the top cap of the beer
tower first. Then use the supplied spanner to adjust the tap.
Connecting the CO2 cylinder and beer keg
Note: The diagram below is for reference only. For actual connections, please
follow the manufacturer's instructions supplied with the CO
keg. All connections should be done by professionals only.
Be gentle when locating CO
damage.
1.
Beer keg
2.
Keg tap
3.
Beer line
4.
Beer tower
5.
CO
line
2
6
GE632-GE633_ML_A5_v1_20210423.indb 6
GE632-GE633_ML_A5_v1_20210423.indb 6
Spanner
cylinder and beer keg into the cabinet to avoid any
2
6.
Tee Joint for CO
lines
2
7.
CO
regulator
2
8.
CO
cylinder
2
9.
CO
line (#1)
2
10.
CO
line (#2)
2
cylinder and beer
2
2021/4/23 13:26
2021/4/23 13:26

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ge633

Inhaltsverzeichnis