Installing The Tap; Installing The Undersink Unit - clage Zip HydroTap MINIBOIL Gebrauchsanleitung

Vorschau ausblenden Andere Handbücher für Zip HydroTap MINIBOIL:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Installation
Boiling point calibration
Jumper position Boiling point
98 °C
top
(factory setting)
centre
95 °C
down
92 °C
Electronics board
QA
Boiling
Signal
Inlet
Steam
water
lead
Cold
water

Installing the tap

Tap
Note: The tap must not be installed more than 900 mm above the base of the
undersink unit. Failure to do this may result in poor water delivery.
Spacer
Note: Under no circumstances should the tap be twisted after the installation is
complete.
Threaded rod
1. Make sure that the tap location will allow water from the tap to fall into a sink or
other basin fitted with a drain to drain away.
2. Cut a 35 mm diameter hole in the worktop / sink at the place where the tap is to be
installed.
3. Push the black spacer on to the tap from underneath and ensure it remains in posi­
S/S washer
tion. A light smearing of silicone sealant on the underside of the spacer will ensure
a watertight fit.
4. Pass the hoses down through the 35 mm hole in the worktop / sink and locate the
Spider clamp
tap head on its mounting location.
5. From the underside, push the stainless steel washer over the hoses and then push
Fixing nut
the spider clamp on to the threaded rod of the tap fitting. Secure the spider clamp
with the fastening nut. Check the tap head is in the correct position before tighten­
ing up the nut.
Altitude

Installing the undersink unit

0 – 600 m
Note: An air gap of at least 50 mm at the left and right of the unit must be
600 – 1400 m
provided for adequate ventilation. If the unit is to be operated inside a cupboard,
> 1400 m
the silicon buffers supplied should be affixed to the inside edge of the cupboard
doors. The 4 mm air gap thus created provides a minimum fresh air supply.
Note: Additional ventilation must be ensured if the temperature in the base unit
exceeds 35 °C.
Note: For high-altitude operation, the boiling point must be recalibrated by a
specialist. The appliance must be opened and the jumper on the electronic board
must be reset according to the table.
1. Position the undersink unit as close to the tap as possible.
2. Fit the pressure limiting valve to the isolating valve (not supplied)
3. Mount the bracket for the external filter in an accessible position near the water
connection and install the filter in the bracket.
4. Connect up the pressure limiting valve to the filter bracket and connect the filter
Power
bracket to the water inlet of the undersink unit. Note the flow direction marks on
lead
the filter bracket. Use the flexible hoses supplied to make these connections.
5. Connect the tap hoses to the undersink unit. Ensure there is a continuous fall from
the tap down to the undersink unit. Trim the hoses to avoid loops and kinks. The
hoses must not be lengthened.
a. Connect the red marked silicon hose to the boiling water connection.
b. Connect the unmarked silicon hose to the steam connection.
c. Connect the cold water connection on the unit to the push­fit connector on the
tap. Use the blue plastic hose, trimming it to length as necessary.
4. Connect the signal leads of the tap and the undersink unit. Attach the plug
connection at a location away from any water splashes.