Herunterladen Inhalt Inhalt Diese Seite drucken

IKEA ISANDE AA-2242215-2 Bedienungsanleitung Seite 9

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ENGLISH
To check
Check if there is no collision
between parts/furniture while
opening and closing the door.
Install the appliance in the
built-in structure.
Make sure that at first installa‐
tion or after reversing the
door the appliance stands in
vertical position for at least 4
hours before it is connected to
the power supply.
Evaporative tray
Before using the appliance make sure that
melting water outlet is connected to the
evaporative tray above the compressor.
If the answer is YES
No action
No action
No action
If the answer is NO
Refer to the assembly instruction -
door alignment.
Follow the assembly instruction for
the proper installation.
Wait 4 hours before connecting the
appliance to the power supply.
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis