Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning And Adjustments - Teddington ELLIPSE FLACH Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

E L L I P S E f l a c h / o v a l

16 Commissioning and adjustments:

How to adjust your system perfectly to your needs
Before commissioning your air curtain system, you must ensure that all water installations and
electrical installations have been carried out correctly.
The heater battery connections for warm water operation are located at the top of the unit.
Flow/reverse flow runs are marked. Cable glands for connecting the motors to the power supply
are also located on the top of the system. For systems with electrical heating elements, the cable
gland is located on the top of the system. Other connection options are available on request.
To avoid the risk of electric shock, the heating must be connected before
connecting the electricity. Check that the system is de-energized before
connecting the heating!
For systems with integrated thermostatic control valve, the valve is NOT
"sealed" when screwed in. The connection is only sealed when screwed
together after pipe installation!
All water and electrical installations must be performed by specialist
companies (plumbers, electricians). Teddington Luftschleieranlagen GmbH
can otherwise not assume any warranty (see chapter "Safety").
Only connect heating pipes with appropriate tools, so that connections
(pipes, heat exchanger connections) are secured to prevent twisting.
Before commissioning all pipes must undergo an expert pressure inspection.
Similarly, all electrical cables must be inspected! Incorrect connection can lead
to danger to life! Important: no safety parts, covers and grounding conductor
connections may be removed.
Measure the fan motor's electrical input and compare it with the electrical
input data on the model label.
33
www.teddington.de

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ellipse oval

Inhaltsverzeichnis