Herunterladen Inhalt Inhalt Diese Seite drucken

Mechanical Installation; Important Notes - Lenze EZN3B0110H030U Montageanleitung

Unterbau-netzfilter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3

Mechanical installation

3.1

Important notes

The mounting location must always fulfill the operating conditions specified in the
ƒ
Technical data. (¶ 24). If necessary, take additional measures.
The mounting plate of the control cabinet must be:
ƒ
– electrically conductive
– free of lacquer
The mechanical connections must always be ensured.
ƒ
(
Stop!
Heavy device weight
The device is very heavy and must be lifted for the mounting.
Possible consequences:
ƒ
ƒ
Protective measures:
ƒ
ƒ
ƒ
EDKZN3B030 DE/EN/FR 1.0
Injury to persons, particularly backache when lifting and holding the device,
respectively
Injury to persons and damage to material assets due to the device falling
down
The device must only be carried with a load bearing system such as an
indoor crane permitted for the device weight
Before the transport, the hoist, the load bearing system and lifting
accessories must be checked for sufficient payload and faultless status
Do not remove the hoist and the lifting accessories until the device lies safe
on a stable surface or is finally mounted.
l
Mechanical installation
Important notes
3
27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis