Herunterladen Inhalt Inhalt Diese Seite drucken

Cable Management; Adjustment Of The Gas-Liſt System - ONKRON G140 Benutzerhandbuch

Tischhalterung für zwei monitore mit gasliſt-system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 10

5. Cable management

5.1
E
5.2
E
6. Adjustment of the gas-liſt system
6.1 Adjust tension of the gas-liſt system in each arm to match weight of your
screens. Turn the key to (+) for heaver screens, or to (-) for lighter ones. Move the
screen up and down, until it is stable in any position you choose. The arm must be
adjusted for each screen individually. If the arm is falling down – turn to (+), if the
arm is moving up – turn to (-).
8
5.1 Take off plastic panels from the lower part
of the arm by sliding them away from the tube
(E).
5.2 Lay cables through the top parts of the arm (A).
5.3 Install plastic panels back on their
places by sliding them towards the tube (E).
Keep in mind that cables should hang down a
5.3
bit to provide easy movement of the arm.
6.1
-
(-)
+
+
(+)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis