Installation

Boiler transport

Removing the casing

1
2
4
8
Boiler transport
The THISION L boiler will be supplied
as a complete unit being fully assem-
bled and pre-tested. The packaging
dimension is 1050x572x575mm for
boiler types 50-85 and
1185x674x665mm for boiler types 100-
145, which makes it possible to trans-
port all models through a normal door
in one piece.
The THISION L can be transported with
a crane, but it has to be ensured that
the boiler is packed and fixed on a pal-
let. The straps must be connected to
the pallet.
3
Removing the casing
Remove the casing before installing the
boiler, in order to avoid damage to the
casing parts. Removing the casing is
done as shown on the pictures.