Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38
6. Assembly
Check that all parts, necessary tools and safety aids are present (e.g. helmet, gloves, safety shoes).
Required tools:
- Rope
- Spirit level
Assemble the components following the steps shown in appendix T4 and T5
Make all the connections as shown in Annex T3
See the table below for the reference to the annex with the configuration table and configurations per type of rolling tower
EN

Configuration

RS TOWER 51
RS TOWER 51+/52
Configuration table and assemblies RS TOWER 51
Configuration table and assemblies RS TOWER 51+
Configuration table and assemblies RS TOWER 52
Configuration table and assemblies RS TOWER 54
Configuration table and assemblies RS TOWER 55
RS TOWER 54/55
6.1. RS TOWER 51 (75 cm rolling tower)
A. Base section
A1: Odd working height
1. Start with two 7 rung frames (part T2.A)
2. Place the wheels (part T2.C) in the frames, apply the brake and
point them outwards [T3.1 - T3.3]
3. Place horizontal braces (part T2.G) under the first rung on the
uprights [T3.4 - T3.5]
4. Place the Safe-Quick Guardrails® (part T2.F) on one side on the
upper rung with the instruction label facing inwards [T3.14 - T3.18].
5. Place a (temporary) platform without a hatch (part T2.E) on the 3rd
rung [T3.20 - T3.22]
6. Adjust the base section with a spirit level by turning the spindles
7. Mount the triangle stabilizers (part T2.I) [T3.9 - T3.13]
8. Place the 7 rung frames (part T2.A) and secure them
[T3.6 - T3.8].
9. Place the diagonal braces (part T2.H) (rungs 5-9)
10. Place a platform with a hatch (part T2.D) on the 7th rung
[T3.20.x - T3.22]
11. Climb through the hatch and sit on the platform with the legs
through the hatch and assemble the 4 horizontal braces
(part T2.G)
12. Remove the platform of the 3rd rung together with the
Safe-Quick Guardrails
13. Place the diagonal braces (part T2.H) (rungs 1-5)
B. Middle section
1. Place the 7 rung frames (part T2.A) and secure them [T3.6 - T3.8].
2. Place the diagonal braces (part T2.H) (rungs 5-9)
3. Place a platform with a hatch (part T2.D) on the 7th rung [T3.20 - T3.22].
4. Climb through the hatch and sit on the platform with the legs through the hatch and assemble the 4 horizontal braces (part T2.G)
C. End section
1. Place the 7 rung frames (part T2.A) and secure them [T3.6 - T3.8].
2. Place the Safe-Quick Guardrails® (part T2.F) on the upper rung with the instruction label facing inwards [T3.14 - T3.18].
3. Place a platform with hatch (part T2.D) [T3.19 - T3.22]
4. Enter the platform through the trap door and place the toe board kit (part T2.J) [T3.23 - T3.25].
28
www.altrex.com
Attachment
T4
T5
T6
T7
T8
T9
T10
T11
A2: Even working height
1.
Start with two 7 rung frames (part T2.A)
2. Place the wheels (part T2.C) in the frames, apply the brake and
point them outwards [T3.1 - T3.3]
3. Place horizontal braces (part T2.G) under the first rung on the
uprights [T3.4 - T3.5]
4.
Place the diagonal braces (part T2.H) (rungs 2-6)
5. Place a (temporary) platform without a hatch (part T2.E) on the
1st rung [T3.20 - 3.22]
6. Adjust the base section with a spirit level by turning the
spindles
7.
Mount the triangle stabilizers (part T2.I) [T3.9 - T3.11]
8.
Place the 4 rung frames (part T2.B) and secure them
[T3.6 - T3.8]
9.
Place a platform with a hatch (part T2.D) on the 7th rung
[T3.20 - T3.22]
10. Climb through the hatch and sit on the platform with the legs
through the hatch and assemble the 4 horizontal braces
(part T2.G)

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rs tower 52Rs tower 54Rs tower 55Rs tower 51 safe-quickRs tower 52 safe-quickRs tower 54 safe-quick ... Alle anzeigen

Inhaltsverzeichnis