Herunterladen Inhalt Inhalt Diese Seite drucken

Leister LHS Serie Bedienungsanleitung Seite 16

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Description of air heater
LHS 210/410 SF/DF
2
7
1. Threaded holes for device mounting
2. Connection housing cover
3. Screws for connection housing cover
4. Cable gland for mains connection (factory fitted)
Preparation
• Remove the LHS air heater from the packaging.
• Loosen the screws (3) to remove the cover of the connection housing (2).
• Remove the warning note, read carefully and keep it for further reference.
• Assemble the connection cable.
• Pull the connection cable through the cable gland (4).
• Connect the connection cable to the connection pins. as per the "Wiring Diagram" section.
• Check connections for secure screw connection.
• Attach the cover for the connection housing (2) using the screws (3). Retighten cable through the
cable gland (4).
• Tighten the cable gland (4).
Installation
• The installation must ensure that:
- the locally valid standards and guidelines are taken into account.
- the supplied air conforms to the specifications under the chapter "Technical data".
- no (heat) backflow occurs.
- the air heater is not flowed by the hot air jet of another device.
- the air heater is protected against mechanical vibrations and vibrations.
- the air heater is attached to the threaded holes for the device assembly (1)
(For installation dimensions see pages 3-4)
- the connection housing of the air heater is not damaged by backflowing hot air.
16
4
3
Air flow
5
6
1
8
LHS 210/410 SF-R/DF-R
2
9
7
8
5. Heating tube
6. Screws for heating tube
7. Injection opening
8. Threaded holes for blow-in spigot mounting
9. Thermal bridge pipe
4
3
Air flow
5
6
1

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis