Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Requirements - FS POE+ Serie Schnellstartanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Front Panel LEDs
SYS
SYS
1
3
5
7
9
11
PWR
4
6
8
10
12
2
S3400-24T4FP
PWR
LEDs
PWR
SYS
Lnk/Act
PoE
Back Panel
Power Supply (DC)

Installation Requirements

Before you begin the installation, make sure that you have the following:
Phillips screwdriver.
M6 screws.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Category 5e or higher RJ45 Ethernet cables for connecting the network devices.
4
Lnk/Act
1
3
5
LnK/Act
13
15
17
19
21
23
25
27
25F
27F
PoE
LnK/Act
14
16
18
20
22
24
26
28
26F
28F
RESET
PoE
2
4
6
PoE
Status
Description
ON
Switch is powered on.
Blinking Green
System is working properly.
ON/OFF
System is working not properly.
Blinking Green
Data is being transmitted or received.
ON/OFF
Connection is not connected.
ON
Connected PD device, working properly.
7
9
11
13
15
17
19
21
8
10
12
14
16
18
20
22
Grounding Point
COMBO
PoE
23
25
27
25F
27F
CONSOLE
24
26
28
26F
28F
Power ON/OFF
Power Supply (AC)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis