The explosion-proof breaker of the air conditioner should be all-pole switch. The distance between its two contacts should not be no
A explosion-proof breaker must be installed.
JZ025-C2
FOR
JZ025-A1
JZ035-C2
JZ035-A1
JZ050-C2
To Indoor unit
Outdoor uni
POWER
1
20
1
20
1
25
1
25
JZ070-C1
JZ050-A1
FOR
Outdoor unit
To Indoor unit
{
POWER
15
1.0
15
1.5
1.5
20
2.5
20
.
ceramic type of T 25A/250V.
Model
JZ025-C2
2
4G 1.0 mm
Connecting wiring
2
3G1.0mm
Power cable
20
30
20
30
30
25
30
25
JZ025-A1
JZ035-C2
JZ035-A1
 
JZ050-C2
JZ050-A1
2
4G 1.0 mm
4G 1.0 mm
2
3G2.5mm
3G1.5mm
JZ070-C1
2
2
24