Maxeon  Solar  Technologies  recommends  a  conservative  minimum  cable  bend 
radius of equal to or greater than 60mm and must not be bent on the direct exit 
of the connector or junction box. The AC Module cable system features locking 
connectors which, after connected, require the use of a tool to disconnect. This 
defends  against  untrained  personnel  disconnecting  the  modules  when  under 
load. Enphase AC cable connectors are rated and tested to interrupt load current; 
however,  Maxeon  Solar  Technologies  recommends  that  you  always  open  the 
utility  dedicated  branch  circuit  breaker  to  remove  power  before  plugging  or 
unplugging any connectors; install an AC isolator in accordance with local codes. 
 
4.1 Equipment Grounding 
Module  grounding  is  required  as  per  IEC  60364‐7‐712  and  where  deemed 
mandatory  within  the  local  regulatory  framework.  The  purpose  of  the  module 
grounding is both for protection and functional reasons. The functional aspect of 
this requirement is to enable the Inverter or power conditioning device to provide 
earth  fault  detection  and  any  alarm  indication.  Maxeon  Solar  Technologies 
recommends using one of the following methods of grounding the module frame. 
In addition, to avoid corrosion due to dissimilar metal interfaces, Maxeon Solar 
Technologies  recommends  stainless  steel  hardware  between  copper  and 
aluminum. Testing should be done to validate grounding with temperature, salt 
environment and high current. 
1)
Grounding  using  specified  grounding  holes:  Use  the  mounting  frame 
provisioned grounding holes for connecting the module to the racking with 
a suitably sized earthing conductor. 
 
2)
Grounding with clamp / claw: Clamp or claw can be installed between the 
module and racking system.  Align a grounding clamp to the frame hole, and 
place a grounding bolt through the grounding clamp and frame. Ensure the 
clamp used when is fastened, will effectively pierce the anodized coating of 
the module and ensure suitable conductivity. 
 
3)
Modules may be grounded by attaching a lay‐in lug to one of the grounding 
holes on the module frame, and attach the ground conductor to the lug. Use 
stainless steel hardware (bolt, washers, and nut). Use an external‐tooth star 
washer  between  the  lug  and  the  module  frame  in  order  to  pierce  the 
anodizing  and  establish  electrical  contact  with  the  aluminum  frame.  The 
assembly must end with a nut that's torqued to 2.3‐2.8 Nm (for a M4 bolt). 
A lock washer or other locking mechanism is required to maintain tension 
between the bolt and the assembly. The conductor must be attached to the 
ground lug using the lug's set screw.  
4)
Modules may be grounded using a ground clip or ground washer or as part 
of  a  module  clamp.  These  grounding  clips/washers  must  be  able  to 
effectively pierce the anodized coating of the module frame and establish 
suitable electrical conductivity.  
All above solutions are possible but should be tested with the mounting structure 
for grounding purpose. 
4.2 Connection to AC Circuits      
It  is  the  installer's  responsibility  to verify  grid  compatibility  in  your  installation 
region (240/380 or 4‐wire 2‐pole). The AC Modules must be connected to a utility 
source  at  the  correct  voltage  and  frequency  in  order  to  operate  and  produce 
power. They are not standalone generators and do not create AC voltage thus are 
not  capable  of  operation  independent  of  a  utility‐generated  AC  signal.  The  AC 
Modules must be connected only to a dedicated branch circuit. The AC cables and 
connectors are certified and rated for the maximum number of AC units in parallel 
only. When connecting modules, DO NOT exceed the following single AC branch 
circuit maximum number of modules. 
The maximum number of microinverters that can be installed on each AC branch 
circuit can be found in the Product's datasheet. This circuit must be protected by 
overcurrent protection. Plan your AC branch circuits to meet the following limits 
for maximum number of AC Module per branch when protected with a 20 amp 
(maximum) over current protection device.  
Maximum* IQ 7A Micros per 
AC branch circuit (240 VAC)   
Region: EU 
10 
                                  ©2021 Maxeon Solar Technologies, Ltd. All rights reserved. Specifications included in this document are subject to change without notice.     
Maximum* IQ 7A Micros per 
AC branch circuit (230 VAC)  
Region: APAC 
11 
Limits  may  vary.  Refer  to  local  requirements  to  define  the  number  of 
microinverters per branch in your area. 
CAUTION! To reduce the risk of fire, connect only to a 
circuit provided with 20 A maximum branch circuit 
overcurrent protection. 
Below are the major installation steps: 
1.
Install the Field‐wireable connector pair, optional J‐Box 
2.
Position the Enphase Q Cable 
Per module: 
3
Position AC module and pop‐out microinverters 
4
Connect microinverters to Q Cable connector 
5
Install AC Modules 
6
Manage Q cable to module frame and rail 
Per row: 
7
Create installation map 
8.
Terminate Q cable at last microinverter 
9.
Connect to J‐Box 
10. Energize system 
 
4.3 Cable Management: 
Use cable clips or cable ties wraps to attach the AC cable to the racking. The cable 
must  be  supported  to  avoid  any  cable 
undue sag as per local requirement. 
For Performance 3 AC modules, be careful 
to not unplug the DC cable premounted in 
factory into specific cable supports.  
Dress any excess cabling in loops so that it 
does  not  contact  the  roof.  Do  not  form 
loops smaller than 12 cm in diameter.
 
4.4 Microinverters Connection 
Refer to the major installation steps defined in Section4.2and listen for a click: 
1) when the microinverters are pop out and 
2) when AC connectors engage 
Inspect  the  AC  connectors  to  ensure  that 
they  are  not  broken,  misshapen,  or 
otherwise degraded prior to connection.
Cover  any  unused  connectors  on  the  AC 
cable with Enphase Sealing Caps. Listen for 
a click as the sealing caps engage. 
CAUTION! Install sealing caps on all unused AC connectors 
as these connectors become live when the system is 
energized. Sealing caps are required for protection against 
moisture ingress.
5.0 Module Mounting    
This section contains information for AC Modules. Ensure that you use the correct 
information for your module type. 
The Maxeon Solar Technologies Limited Warranty for PV Modules is contingent 
upon modules being mounted in accordance with the requirements described in 
this section. 
 
5.1 Site Considerations      
AC Module should only be mounted in locations that meet the following 
requirements: 
 
 
MAXEON SOLAR TECHNOLOGIES, LTD. 