The kit, Mat. no. 07493370 for PW 6163, contains the following:
2 x Foot, pre-fitted
2 x Front plinth panel, pre-fitted
2 x Side plinth panel
8 x Raised-head screw 6 x 16
1 x Information sheet
Fitting instructions - Plinth UG 6163, clean-soiled side, Mat. no. 07564360.
List of illustrations:
Fig. 1, side panel and service panel removal
Fig. 2, floor fixing bracket removal
Fig. 3, foot fitting
Fig. 4, front plinth panel and side plinth panel fitting
Disconnect the machine from the steam supply (if applicable) and electric mains, and ensure utilities cannot be switched on again in
error.
Remove the 2 side panels and 2 service panels, Fig. 1.
Unscrew the machine floor fastening.
Note
If present, remove any spacer plates that may be in use and take care to note the number fitted and their positions so that they can
be refitted in an identical manner.
Disconnect the floor drain.
Use a suitable lifting aid to raise the machine by approx. 200 mm.
E.g. pallet truck and suitable wood blocks.
Danger!
Take suitable measures to ensure the machine cannot fall.
Unscrew the 4 floor fixing brackets, Fig. 2, Pos. 1.
Fit the pre-fitted feet, Fig. 3, Pos. 2, on the left and right under the machine base frame and screw them in position.
(On each corner, 2 screws from the inside and 2 screws from the bottom, see Fig. 3, Pos. 3.)
Extend the connection between the machine drain outlet and the on-site drain by approx. 170 mm.
Lower the machine and return it to its original position.
Check that the machine is perfectly level in all directions.
If necessary, level the machine by fitting spacer plates as appropriate.
Fit the floor fixing bolts through the fixing brackets in the existing holes, Fig. 4, Pos. 1.
Fit the 2 front plinth panels, Fig. 4, Pos. 2, at the front and back, and align them with the corners of the machine.
Fit the 2 side plinth panels, Fig. 4, Pos. 3. Readjust the 2 front plinth panels if necessary, Fig. 4, Pos. 2.
Refit the 2 side panels and 2 service panels.
Carry out appropriate electrical safety checks.
Reconnect the machine to the mains and the steam supply (if applicable).
en
10.05.2010
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Umbau- und Montageanweisung
M.-Nr. 07564360

Werbung

loading

Diese Anleitung auch für:

Ug 6163Ug 6323Ug 6243