Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Procedures - Motorola PMLN7018 Bedienungsanleitung

Vehicular charger/holder
Vorschau ausblenden Andere Handbücher für PMLN7018:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 51
01_EN.fm Page 5 Monday, March 28, 2016 10:08 AM

INSTALLATION PROCEDURES

OPERATIONAL CAUTION
!
a u t i o n
An air bag inflates with great force. DO NOT place
objects, including communications equipment, in the area
over the air bag or in the air bag deployment area. If the
communication equipment is improperly installed and the
air bag inflates, this could cause serious injury.
If necessary, contact the vehicle manufacturer for air bag
information specific to the vehicle.
Verify that none of the vehicle's systems are affected by
use of the TETRA Handportable Terminal e.g. cruise
control, ABS braking, traction control, engine
management, direction indicators, lights etc.
Use existing openings through the bulkhead to avoid
drilling. If drilling is a must, verify that no damage is done
to the Vehicle Electronic Control Modules (ECMs), Fuel
pipes, brake pipes and/or cable looms.
VEHICULAR CHARGING CRADLE/RADIO
HOLDER INSTALLATION
Note:
Always use the supplied fastening hardware to rigidly
secure the cradle. An unsecured cradle could cause a unit
to move and interfere with the proper operation of the
vehicle and the charging cradle/radio holder must be
mounted in such a way that the TETRA Handportable
terminal is within easy reach of the driver during normal
operation of the vehicle.
Sufficient room should be allowed to permit the insertion of
the TETRA Handportable terminal and provide easy access
to the release mechanism of the TETRA Handportable
terminal from the cradle/holder.
5

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pmln6181Pmln6182

Inhaltsverzeichnis