Herunterladen Diese Seite drucken

Tools Required - AC Schnitzer 5171 320 310 Montageanleitung

Seitenschweller

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

G e n e r a l N o t e s !
AC Schnitzer Side Skirts G20-G21 / G22
Important Notes !
These Fitting Instructions must be read in full before beginning installation work. AC Schnitzer bears no liability for
damage caused by incorrect installation !
These Fitting Instructions are intended solely for use by authorised AC Schnitzer dealers. These Fitting Instructions are
in all cases directed at professionals trained in BMW vehicles who have the corresponding specialist knowledge.
All diagrams show LHD vehicles, for RHD vehicles proceed accordingly or follow separate Fitting Instructions.
As manufacturer, we are obliged to point out that any changes you make to a vehicle licensed for use on public roads
require approval by a test centre and registration in the vehicle documents.
As the legal regulations may vary according to location, please contact the competent authorities for information.
Fitting
Carry out all work in accordance with applicable safety regulations (e.g. wear safety goggles).
Components and surfaces to be glued together must first be thoroughly cleaned with cleaner !
The adhesive drying time is 24 hours. The vehicle can be washed in a car wash after approx. 48 hours.
only in combination with M-Technik aerodynamics SA-715
Fitting Time (1 unit = 5 minutes)
The fitting time is around 10 units, which may vary depending on vehicle condition and equipment level.

Tools Required

Masking tape
Drill Ø 5.5mm
Cordless screwdriver or drill
Fitting Instructions No.: 5171 320 310-5171 322 310 / Issue: 09.12.2020 / TSch / REV01
AC Schnitzer - Neuenhofstraße 160 - D - 52078 Aachen - Tel. 0241/5688 -130 / www.ac-schnitzer.de
12

Werbung

loading

Diese Anleitung auch für:

5171 322 310