Herunterladen Inhalt Inhalt Diese Seite drucken

Ravelli HR EVO 200 SMART Bedienungs- Und Wartungshandbuch Seite 65

Vorschau ausblenden Andere Handbücher für HR EVO 200 SMART:
Inhaltsverzeichnis

Werbung

Rev.0 21/12/2020
Use and maintenance manual
HR EVO 200-250 SMART
Pag.13
The boiler needs to be connected to a single chimney that
guarantees the draught declared by the Manufacturer
and observes the installation regulations that apply to
the installation site.
The room where the boiler is installed must have an air
intake.
Before using the boiler it is necessary to know the position
and function of the controls.
If the chimney catches fire you must call the fire brigade.
Make sure the electrical system and the sockets are
suitable for the maximum absorption of the unit, specified
on the label and in this manual.
Connect the unit to the heating system; under no
circumstances can it be used without the hydraulic
connection and without water in the heating chamber
and system.
The power plug must be easily accessible.
Only use original spare parts. Any tampering and/or
replacements that have not been authorised by Ravelli
can
pose a danger to the user's safety.
The appliance must not be used by children under the
age of 8 or by people with reduced physical, sensorial or
mental capacities or without experience or without the
necessary knowledge, and always with supervision.
Arrange the power cable and any cables of external
sensors so that they do not touch hot parts of the unit.
Do not operate the unit with the fire door and/or ash box
door open.
Do not handle easily flammable or explosive substances
near the boiler while it is in operation.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hr evo 250 smart

Inhaltsverzeichnis