Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Environment - Code 3 CD3794 Installations- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für CD3794:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting:
Mounting:
Synchronization: Yellow
Pattern Switch: Blue
Negative: Black
Positive - LED Color 2 & Color 4: White
Positive - LED Color 1 & Color 3: Red
*For extra adhesion, use 3M Tape Primer. For product & application information, go to: https://multimedia.3m.com/mws/media/65952O/3mtm-tape-primer-94.pdf
Wire:
RED: Positive, Colors 1 & 3 (need to add 5A fuse)
WHITE: Positive, Colors 2 & 4 (need to add 5A fuse)
BLACK: Negative
BLUE: Pattern select to negative
YELLOW: Synchronized Function
(Up to 8 units can be Synchronized)

Operation Environment:

Ambient Temperature: -30 to 50°C
Use this cut-out to verify surface curvature is appropriate for install of flexible directional light. Light must be mounted on curved or elliptical surface, it cannot be mounted
on abrupt edges. See Figures 1 and 2 below. Verify template is sized to 5" dimension provided.
Light will mount on this surface as vehicle curve does
not touch inner surface of template.
LIGHTHEAD
BEZEL
SCREWS
Figure 1
Mounting on a curved surface:
1. Use template on page 3 to verify light will fit curved surface.
2. Mark hole location using gasket as a template and drill hole for wire exit using
11/32 in. drill bit.
3. Wipe surface clean with alcohol wipe. Wait until dry.
4. Mount light using VHB adhesive. Peel adhesive backing and apply pressure
to adhere to surface for 20 seconds. It is recommended to allow 24 hours for
adhesive to fully adhere before powering on light.
* Do not use hardware, gasket or bezel when mounting on curved surface.
VHB Adhesive
* Max surface curvature 120°.
Mounting on flat surface:
1. Mark wire and screw locations using gasket as a template. Drill wire exit hole
using 11/32 in. drill bit. Pre-drill screw holes using 3/64 in. drill bit.
2. Peel VHB backing and apply light to surface, aligning screw holes and wire exit.
Apply pressure for 20 seconds. Insert screws through bezel to finish mounting
lighthead. It is recommended to allow 24 hours for adhesive to fully adhere
before powering on light.
Phase Operation:
Phase 1 (Ph1) flashes simultaneously with Ph1
Phase 2 (Ph2) flashes simultaneously with Ph2
Ph1 alternates with Ph2
(Up to 8 units can be Synchronized)
Apply BLUE TO BLACK wire:
-Less than 1 sec. for next pattern
-Between 1-3 sec for previous pattern
-Between 3-5 sec. for factory default
-More than 5 sec. for steady burn
Light will not mount on this surface as vehicle curve is
touching inner surface of template.
Figure 2
Page 2 of 4

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis