Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Before Using The Appliance For The First Time; Installation - SHE SHE5AC2005 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

BEFORE USING THE APPLIANCE FOR THE FIRST TIME

Unpacking the Appliance
1. Open the carton and take out the appliance.
2. Remove all packaging from the appliance.
3. Unwind the mains cable completely and make sure not to damage it.
Transport wheels
For easier transport, the appliance is equipped with transport wheels.
In addition, two rollers are equipped with a locking brake to guarantee that they remain firmly
in position.
1. After the appliance has been carefully unpacked, insert the
transport rollers into the designated notches on the bottom of
the appliance.
2. To adjust the locking brakes, press the levers as follows:
PRESS DOWNWARDS  to fix the brake
PUSH UPWARDS to release the brake
Removing transport protection in the water tank
The water pump is fixed to the bottom of the water tank in a safety holder that is also
provided with a removable transport securing device.
1. Push the blowout latch located above the water tank upwards, so that the water tank
can be pulled out.
2. Cut through the transport securing device located above the water pump, and remove
it from the safety holder.
3. Now you can release the pump from the holder if necessary to remove the water tank
from the air cooler completely.

INSTALLATION

Please note the following points for installation.
1. Place the appliance on a level and solid surface and adjust the locking brakes so that
the appliance stands firmly in position.
2. There must be at least a 50 cm gap to walls or other objects.
3. Before using the appliance, make sure that both the air inlet and the air outlet are free
of obstacles and are not blocked.
4. Connect the appliance to an earthed outlet.

COMMISSIONING

Seite 18 von 123

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis