Herunterladen Inhalt Inhalt Diese Seite drucken

Transport & Handling; Transport; Installation - Scantool 220 GSHT Gebrauchsanweisung

Metall-bandsäge
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. TRANSPORT & HANDLING

4.1 Transport

Unpacking
1. Transportation to desired location before unpacking, please use lifting jack.(Fig. B)
2. Transportation after unpacking, please use heavy duty fiber belt to lift up the machine.
ALWAYS KEEP PROPER FOOTING & BALANCE WHILE MOVING THIS MACHINE.

Installation:

As this machine weighs 208 kg. It is recommended that the machine shall be transported with
help of lifting jack.
4.2 Transportation Recommendation:
1. Tighten all locks before operation.
2. ALWAYS Keep proper footing & balance while
moving this 155kgs machine, and only use heavy
duty fibres belt to lift the machine as Fig. A
3. TURN OFF the power before wiring, & be sure
machine is on proper grounding, overload & circuit
breaker is recommended for safety wiring.
4. TIGHTEN 4 boltne to base holes after machine is balanced.
5. CHECK carefully if the saw blade is running in counter-clockwise
direction - if not, reverse the wiring per circuit diagram then repeat the running test.
6. KEEP machine always out from sun, dust, wet, rainy area.
4.3 INSTALLATION
1 Always Keep proper footing & balance while
moving this 208 kgs machine. And only use heavy-
duty fiber belt to lift the machine as per Fig. (B).
Fig. B
Scantool 220 GSHT
33

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis