Herunterladen Inhalt Inhalt Diese Seite drucken

getAir PUSH Montage- & Bedienungsanleitung Seite 26

Vorschau ausblenden Andere Handbücher für PUSH:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Connect connecting cables for the
fans to the control unit (+12 V, PWM,
GND).
7. Connect the power supply unit to the
control unit (+12 V, GND).
8. Place the power supply unit in the
flush box.
9. Secure the base in the flush box.
10. Attach the frame to the base and
secure with the mounting nut. Attach
the rotary selector.
Top-hat rail power supply unit (option 2)
Route the following cables from the con-
trol unit installation site:
Each data cable (e.g. LiYY (4x0.25
mm² to 0.75 mm²)) to each ventila-
tion unit, in star configuration
A 42 V cable (2x1.5 mm²) to the
top-hat rail power supply unit in the
junction box
26
2
1
12 V
1. Create a standard height wall opening
for the flush box at the control unit in-
stallation site.
2. Route connecting cables for the fans to
the flush box.
3. Route the top-hat rail power supply unit
cable from the junction box to the flush
box.
4. Mount the flush box in wall opening.
5. Connect connecting cables for the fans
to the control unit (+12 V, PWM, GND).
6. Connect the top-hat rail power supply unit
cable to the control unit (+12 V, GND).
4
12 V

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis