Herunterladen Diese Seite drucken
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 2
TENT PITCHING INSTRUCTIONS – ASSYNT (UK)
Flysheet First Pitching
1. Assemble poles and lay them on the ground
2. Open out flysheet and position in required direction
3. Ensure the flysheet doors are closed when pitching the tent
4. Locate one end of pole into corresponding coloured eyelet on pole anchor strap.
5. Push poles into an arch from opposite sides and locate pole ends into corresponding coloured
eyelets.
6. Clip all flysheet pole clips to tent poles
7. The tent will stand up by itself, which lets you finalise its position. Pitch the back of the tent into
the wind for a stable tent, and sheltered enterance.
8. Peg down pole anchor straps and remaining flysheet pegging points
9. Peg out ALL guy lines.
Inner Attachment
1. Open out inner tent inside flysheet and position doorways to correspond with the living area
2. Starting from the rear corners of the tent, attach the elasticated hooks on the groundsheet to
corresponding rings on the flysheet
3. Suspend the inner by attaching elastic of inner tent to the clips on the inside of the flysheet
...........................................................................................................................................................................
loading

Inhaltszusammenfassung für Vango ASSYNT

  • Seite 2 AUFBAUANLEITUNG – ASSYNT (DE) Mit Außenzeltaufbau zuerst 1. Stecken Sie die Stangen zusammen und legen Sie sie auf den Boden 2. Außenzelt auslegen und korrekt ausrichten. 3. Achten Sie darauf, dass die Außenzelttüren beim Aufbau des Zelts geschlossen sind. 4. Fixieren Sie ein Ende der Stange in die dazu passende Öse in der Verankerungsschnur der Stange.

Diese Anleitung auch für:

Assynt 200