Herunterladen Inhalt Inhalt Diese Seite drucken

Leuze MA 8.1 Bedienungsanleitung Seite 16

Modulare anschlusseinheit fur bcl 8/bps 8
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
B – SW IN/OUT
Pin
Signal
1
VOUT
2
SWO
3
GND
4
SWI
5
FE
Thread
M12 socket
C – PWR IN – HOST/RS485
Pin
Signal
1
VIN
2
RS485B (N)
3
GND
4
RS485A (P)
5
FE
Thread
M12 connector Functional earth
Electrical connection – Commissioning with factory settings
CAUTION
Safety notices!
Ä
Connection of the device and maintenance work while under volt-
age must only be carried out by a qualified electrician.
Ä
During commissioning, protect the device against humidity and
soiling.
Ä
Observe the degree of protection, VDE protection class and pro-
tective circuit.
Ä
Before connecting the device, be sure that the supply voltage
agrees with the value printed on the name plate.
Ä
Ensure that the functional earth (FE) is connected correctly. Fault-
free operation is only guaranteed if the functional earth is con-
nected properly.
Ä
Connect the connection unit to the BCL 8 or to the BPS 8.
Ä
Switch on the supply voltage.
The status LED on the BCL 8 or BPS 8 must illuminate green.
16
Description
Sensor/actuator supply voltage: 10 ... 30 V DC, direct
connection to power supply unit
Switching output, max. 60 mA
Ground
Switching input, 10 ... 30 V
Functional earth
Functional earth
Description
Supply voltage 10 ... 30 V DC
Data from and to BCL/BPS 8
Ground
Data from and to BCL/BPS 8
Functional earth

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ma 8-01Ma 8-02

Inhaltsverzeichnis