Herunterladen Inhalt Inhalt Diese Seite drucken

Performing The Inspection - AWG Z2 Originalbetriebsanleitung

Zumischer
Vorschau ausblenden Andere Handbücher für Z2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AWG I Operating manual I Fittings I
Inspection by the manufacturer
AWG Fitting GmbH offers an inspection as part of its service offering.
Send us your inductor and you will receive the inspected device back
by the agreed date. You will find a return delivery form on our website
www.awg-fittings.com. If required, a rental device can also be provided.
Documenting the inspection result
To meet the requirements for occupational safety and acci-
dent prevention, the test results for each test must be doc-
umented. Please observe the country-specific regulations.
In Germany, the guidelines of the DGUV (Deutsche Gesetz-
liche Unfallversicherung e.V. [German Statutory Accident
Insurance]) apply. A product specific test chart in accord-
ance with the DGUV can be downloaded from www.awg-
fittings.com
– Keep the documented test result as proof.
6.2

Performing the inspection

CAUTION
Performing the inspection safely
Some inspection steps are performed with pressurised systems.
– Observe the safety regulations.
– Wear personal protective equipment.
– Do not put other persons in danger.
6.2.1
BASIC Inspection after each use
1. Inspect the inductor for visible damage.
2. Check the pick tube (accessory) for contamination and damage.
6.2.2
STANDARD Inspection every 12 months
1. Leak test at 10 bar inlet pressure.
36 / 40
Medium expansion foam nozzles M2, M4, M8
ENGLISH
FUNCTIONAL TEST
M1061B10 I Rev. 01-02/20

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Z4Z8Fd z2Fd z4

Inhaltsverzeichnis