Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Start-Up And Operation - oneConcept TuneUp Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN

INSTALLATION

Unpack all parts of the device and remove all packing material.
Do not insert the power plug of the appliance into the power outlet until
you have checked the voltage of the outlet and all connections have been
made.

START-UP AND OPERATION

First use
Before use, make sure that the voltage indicated on the nameplate of the
device corresponds to the voltage of the power outlet. Turn on the power
using the power switch on the back of the unit. When you use the machine
for the first time, it is necessary to set the language and network settings on
the machine.
You can connect to the network either immediately or at a later time. Use
the NAVIGATE/VOL knob to select the desired options. Press the NAVIGATE/
VOL. knob to confirm. If you press and hold the MENU button while the
power is on, the unit will go into standby mode. If you press the button
again, the unit will be turned on again.
22

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1003490210034903

Inhaltsverzeichnis