Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connections - Dea Ghost 100 Bedienungsanleitung Und Hinweise

Inhaltsverzeichnis

Werbung

4.3 How to unlock the operator
WARNING Disconnect the power supply from the control panel before releasing the operator. In case you cannot turn the power
off, you will necessarily have to re-lock the motor in the position in which it was unlocked.
Use the manual release key to unlock the gate (Pic. 6), the operator is unlocked and the gate can move freely. To lock the gate, bring
the gate on the lever assembly which will lock the spring device and brings GHOST 100 in working condition.
4.4 How to fix and adjust the mechanical stops
All GHOST 100 models are supplied with mechanical stops that permit the stroke adjustment while closing and opening when fixed
stops are fixed.
For the assembly and adjustment, proceed as it follows:
• Unlock the operator;
• Position the door approximately to 45° so as to facilitate the assembly;
• Mount the mechanical stops as shown in Pic. 7;
• Adjust the screws (A) and manually move the leaf verifying the correct positioning of the stroke;
• After completing the adjustment, tighten the locking nut (B)
WARNING Mechanical stops must be used with doors up to 200kg for models without encoder and up to 300kg for models with
encoder.

5 ELECTRICAL CONNECTIONS

WARNING To ensure an appropriate level of electrical safety always keep the 230V power supply cables apart (minimum 4mm in the
open or 1 mm through insulation) from low voltage cables (motors power supply, controls, electric locks, aerial and auxiliary circuits
power supply), and fasten the latter with appropriate clamps near the terminal boards.
WARNING During the connection phase, fasten the electric cables with appropriate clamps near the terminal boards and, when possible,
unsheathe the cables to avoid they are too long.
WARNING Maintain the ground conductor at a major length respect the active conductors so that, if the cable exit from its fixing housing,
the active conductors tighten up as first.
Program the control board to complete all adjustments. It is now possible to supply a complete installation in compliance with all stan-
dards required for gate automation. See the instructions provided with the control panel to be connected.
Finally, verify that all adjustments operations have been correctly performed and that safety devices and unlocking device properly
work.
6 START-UP
The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN
12445 standard which establishes the test methods for testing the automation for gates.
DEA System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;
6.1
Installation test
The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the proper
testing of all the automation in 4 easy steps:
• Make sure that you comply strictly as described in paragraph 2 "WARNINGS
• Test the opening and closing making sure that the movement of the leaf match as expected.
We suggest in this regard to perform various tests to assess the smoothness of the gate and defects in assembly or
• Ensure that all safety devices connected work
• Perform the measurement of impact forces in accordance with the standard 12445 to find the setting that ensures compliance with
the limits set by the standard
WARNING Using spare parts not indicated by DEA System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by DEA System and scrupulously follow all
assembly instructions.
6.2
Unlocking and Manual operation
In the event of malfunctions or simple power failure, release the motor (Pic. 6) and perform the operation manually.
The knowledge of the unlocking device is very important because, in times of emergency, lack of speed in operating this device can
cause danger.
WARNING The efficancy and safety of manual operation of the automation is guaranteed by DEA System only if the installation has
been installed correctly and with original accessories.
properly;
EN12453.
SUMMARY";
adjustment;
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis