Herunterladen Inhalt Inhalt Diese Seite drucken

Pentair Riversoft 4 Handbuch Seite 13

Vorschau ausblenden Andere Handbücher für Riversoft 4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36
Manifold configuration
A manual bypass system have to
be installed on the outlet line
(not supplied with the softener)
Soft water pipe
4.2.2. Water supply line
The connections should be hand tightened using PTFE (plumber's tape) on the threads if using the threaded connection type.
In case of heat welding (metal type connection), the connections should not be made to the valve when soldering.
NOTE
See chapter 3.1. Technical specifications, page 7 to identify the connections.
When pressurized, any composite tank will expand both vertically and circumferential. In order to compensate the vertical
expansion, the piping connections to the valve must be flexible enough to avoid overstress on the valve and tank.
In addition, the valve and tank should not be supporting any part of the piping weight. This is hence compulsory to have the piping
fixed to a rigid structure (e.g. frame, skid, wall...) so that the weight of it is not applying any stress on the valve and tank.
Ref. MKT-UG-045 / A - 13.03.2020
Softener
½" overflow line
Drain
Power supply
Hard water pipe
A manual bypass system have to
be installed on the inlet line
(not supplied with the softener)
Drain water pipe
User Guide Riversoft
13 / 132

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis