Herunterladen Inhalt Inhalt Diese Seite drucken

Ecoflam MAX GAS 350 PR Betriebsanleitung Seite 22

Vorschau ausblenden Andere Handbücher für MAX GAS 350 PR:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 111
EN
Service
­ Maintenance
Burner and boiler servicing must only
be carried out by qualified personell.
The system operator is advised to take
out a service contract to guarantee
regular servicing.
Attention
• Disconnect the electrical supply before
1
4
7 7
10
22
www.ecoflam­burners.com
carrying out any maintenance or
cleaning work.
• The blast tube and firing head may be
hot.
Checking the exhaust gas temperature
• Check the flue gas temperature at
regular intervals.
2
5
8
7
11
• Clean the boiler if the flue gas
temperature is more than 30°C above
the value measured at the time of
commissioning.
• To simplify the check, use a flue gas
temperature indicator.
Removing firing head
• See pictures in the order.
3
6
9
12
420010594100

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Max gas 500 pr

Inhaltsverzeichnis