Herunterladen Inhalt Inhalt Diese Seite drucken

About This Guide; Before You Begin - Nortel Networks Business Policy Switch 2000 Installationsanweisungen

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 27

About this guide

This guide provides instructions to install the Nortel Networks Business Policy Switch 2000 on a
table, in an equipment rack, or on a wall. For more detailed information about the switch, refer to
Using the Business Policy Switch 2000 (part number 208700-A).
This guide includes information about the following topics:
Environmental requirements for the installation site (next)
Installing the switch on a table
Network connection requirements
Connecting AC power
Descriptions of LEDs
Initial switch setup

Before you begin

Make sure the area where you will install and use the Business Policy Switch meets these
environmental requirements:
Ambient temperature between 41° and 104° F (5° and 40° C)
Relative humidity between 5% and 85% noncondensing
No nearby heat sources such as hot air vents or direct sunlight
No nearby sources of severe electromagnetic noise
No excessive dust
Adequate power source within six feet; one 15-Amp circuit required for each power supply
At least 2 inches (5.08 cm) on each side of the switch unit for ventilation.
Adequate space at the front and rear of the switch for access to cables.
If you are installing a single Business Policy Switch on a table or shelf, make sure the surface will
support at least 15 to 20 pounds (7 to 9 kilograms).
(page
9), in a rack
(page
16)
(page
18)
(page
20)
(page
22)
(page
10), or on a wall
Business Policy Switch 2000
7
(page
11)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis